(Internal Projects)

Year

Project Description

Tasks

1984-Today

Valves and safety Valves Reconditioning Size : 1/2” -24”, 125PSI-300K (4500 Psi)

Reconditioning, Tests & Certification

1996

Retubing Chiller H-108, PUSRI-II Plant

Fabrication, Installation.

1996

Replacement of Reformer Catalyst Tube(101-B), PUSRI-IB Plant

Procurement, Fabrication, Construction

1997

Repair of Heat Exchanger (Primary Haste Heat Boiler 101-C), PUSRI-II Plant

Fabrication, Erection

1996

Repair of Air Heater EC-301, PUSRI-II Plant

Fabrication, Erection

1997

Retubing Chiller H-108, PUSRI-II Plant

Fabrication, Erection

1998

Portable Conveyor, PT Pupuk Sriwidjaja

Engineering, Procurement, Manufacturing, Commissioning, Start-Up

1998

Retubing Syn-Gas Synthesis CompressorIntercooler, Pusri-II Plant

Fabrication, Erection

1999

RetubingSyn-Gas Synthesis CompressorAftercooler, Pusri-II Plant

Fabrication, Construction

1999

Modification of Dust Recovery System,Pusri-III Plant

Engineering, Procurement, Fabrication

2000

Modification of Dust Recovery system, Pusri-IV Plant

Engineering, Procurement, Fabrication

1999

Total Retubing of Syn-Gas CompressorAftercooler, Pusri-III Plant

Fabrication, Erection

1998

Total Retubing of Methanator EffluentCooler, Pusri-III Plant

Fabrication, Erection

1999

Retubing of Primary Waste Heat Boiler,Pusri-III Plant

Fabrication, Erection

1996

Fabrication & Construction of WaterCurtain & Fog System, Pusri-IV Plant

Engineering, Procurement, Construction

1998

Retubing of Primary Waste Heat Boiler,Pusri-IV Plant

Fabrication, Erection

1999

Retubing of CO2 Stripper Gas Boiler,Pusri-IV Plant

Fabrication, Erection

1999

Modification of Conveyor Chute 2869-VC/VE, Bagging Plant & Conveyor System

Engineering, Procurement, Fabrication, Erection

1999

Retubing of Condenser, Sultan MahmudBadarudin-II Ship

Retubing & Test

2000

Propeller Repair, Pusri-Indonesia Ship

Repair & Test

1999

Ship Transfer Conveyors for Ship Unloading(4 units), 300 T/H Capacity

Engineering, Procurement, Construction, Commissioning, Start-Up

2000

Major Inspection For Ammonia Tanker Ship

Total Inspection

1990-today

Fabrication of Warehouse Stock Spare Parts

Fabrication

 

Equipment Fabrication & Reconditioning
(External Projects)

Year

Project Description

Tasks

1984 -Today

Valves and Safety Valves ReconditioningSize : 1/2” -24”Rating : 125PSI -300K (4500 PSI)
( PT Sri Melamin Rejeki, Palembang
PTPN VII, Bandar Lampung
PT PLN Tanjung Enim)

Reconditioning, Tests & Certification

1995

Reformer Catalyst Tube Replacement (Total Reharping) HP Modified Material
( PT Pupuk Kujang, Cikampek)

Construction, Inspection, Test

1999

Reformer Catalyst Tube Replacement(Total Reharping), HP Modified Material
( Asean Aceh Fertilizer, Lhokseumawe, Aceh)

Construction, Test, Inspection

1999

Ammonia Preheater Retubing
( PT Sri Melamin Rejeki Palembang)

Fabrication, Test

1999

Quench Tower Replacement
( PT Sri Melamin Rejeki, Palembang)

Erection, Test

2000

Reformer Catalyst Tube Replacement (Total Reharping), HP Modified Material
( PT Pupuk Iskandar Muda, Lhokseumawe, Aceh)

Construction, Inspection,Test

2000

Fabrication of Ductile Iron Piping Systemfor Municipal Water Treatment Plant
( PDAM Tirta Musi Palembang)

Fabrication, Inspection, Test

2000

Inspection of Boiler Superheater
( PT PN VII Bandar Lampung)

Inspection

2000

Retubing of Boiler
( PTPN VII Sungai Lengi Oil Mill)

Inspection, Fabrication, Erection, Test

2000

Retubing of Boiler
( PTPN VII Bekri Oil Mill)

Inspection, Fabrication, Erection, test

2000

Electromotor Rewinding
( PTPN VII Cinta Manis Sugar Mill)

Repair

2000

Shafts & Cogwheels Non Destructive Tests
( PTPN VII, Cinta Manis Sugar Mill)

Inspection

2000

Screw Conveyor Fabrication
( PT SMR )

Fabrication, Erection, Test

2000

Boiler Repair
( PT Hindoli Palm Oil Mill Muba)

Repair, Inspection

 

 

 