Pusri’s ability in managing production facilities with the most optimum performance has represent our commitment in performance and contribute for Indonesia.

 

All the production facilities we operate, reflects our passion in implementing revitalization, energy conversion, and green industry.



PUSRI I, II, III, IV, V, and IB facilities are constructed gradually. Each plant is built by well-planned blueprint, inline with the Rencana pembangunan Lima Tahun (Five Years Development Planning) presented by Indonesia Government as anticipation to meet the increasing national fertilizer demand.


Pusri Plant Siang

 

Pusri Plant 2



Pusri I (1963 - 1986)

PUSRI I is a symbol of Indonesian fertilizer industry milestone. Constructed on an area, 20 hectares wide, PUSRI I is the first fertilizer facility in Indonesia which was built on August 14, 1961 and started operating in 1963 with installed capacity of 100.000 tons of urea and 59.400 tons of ammonia per year. At present, the operational of PUSRI I has been replaced by PUSRI IB, due to the facility’s age and efficiency level downturn.

 

Pusri II

PUSRI II is the second fertilizer facility built by Pusri and started to operate on August 6, 1974. Inaugurated by The President of Indonesia on August 8, 1974, with production capacity of 380.000 metric tons of urea and 218.000 metric tons of ammonia per year.



Pusri III

The planning process of PUSRI III was commenced when the government commissioned the operation of PUSRI II facility, as an anticipation to the increasing fertilizer demand. On May 2, 1975, as a response to the government’s resolution, Minister of Industry M Jusuf has officially launched the groundbreaking of PUSRI III project.

 

PUSRI III has a production capacity of 1.100 metric tons of ammonia per day, or 330.000 per year, and 1.725 metric tons of urea a day or 570.000 metric tons per year.



Pusri IV

By the Decree No. 17, April 17, 1975, the President of Republic of Indonesia has assigned the Minister of Industry to take immediate preparations to initiate the construction of PUSRI IV. The construction process was initiated on August 7, 1975, with the groundbreaking done on October 25, 1975, in Palembang by the Minister of Industry M Jusuf.

 

PUSRI IV was built in 1977 with exactly the same production capacity with PUSRI III.



Pusri IB

PUSRI IB facility was built as a substitution of PUSRI I due to its inefficiency. January 15, 1990 was the Early Start Date to carry out the Process Engineering Design Package activity. May 1, 1990 was the effective date of the construction and was inaugurated by the President of Republic of Indonesia on December 22, 1994.

PUSRI IB is the new facility project with production capacity of 396.000 tons of ammonia and 570.000 tons of urea per year. This project implements the energy-saving production process technology of urea and ammonia which is 30% more efficient than the existing facilities.

The scope of PUSRI IB comprises a unit of ammonia facility with 1.350 tons per day or 446.000 tons per year capacity, a unit of urea facility with a capacity of 1.725 tons per day or 570.000 tons per year, and a unit of utility, offsite and auxiliary.